nach oben

DSD NOELL supplies heavy steel structures for Burfell HEP/Iceland

The complete steel lining for the hydropower project “Búrfell Extension HEP” in 23 sections with maximum dimensions of 6.5 m x 6.0 m and single weights of up to 52 tons has been delivered across the sea to Iceland and reached the port of Thorlakshöfn on time in March 2017. An impressive video by our client Landsvirkjun shows the unloading and onward transport to the construction site:

Video Búrfell Extension HEP